349 lines
12 KiB
Markdown
349 lines
12 KiB
Markdown
# Future Topics Backlog
|
||
|
||
**Date Created:** October 19, 2025
|
||
**Purpose:** Track strategic topics for future discussion sessions
|
||
**Status:** Living document - add topics as they arise
|
||
**Usage:** Review weekly, prioritize quarterly
|
||
|
||
---
|
||
|
||
## How to Use This Backlog
|
||
|
||
### Adding New Topics
|
||
When a topic arises that needs discussion:
|
||
1. Add it to the appropriate section below
|
||
2. Include brief context (why this matters)
|
||
3. Note urgency level (Urgent / Soon / Eventually)
|
||
4. Link any related documents or data
|
||
|
||
### Prioritizing Topics
|
||
**Review this backlog:**
|
||
- Weekly: Check if any "Urgent" items need scheduling
|
||
- Monthly: Re-prioritize "Soon" items based on progress
|
||
- Quarterly: Prune "Eventually" items that are no longer relevant
|
||
|
||
**Decision framework:**
|
||
- **Urgent:** Schedule within 1 week (blocker or time-sensitive)
|
||
- **Soon:** Schedule within 1 month (important but not blocking)
|
||
- **Eventually:** Park for 3+ months (nice-to-have, not critical now)
|
||
|
||
---
|
||
|
||
## Current Priority: ICP Validation
|
||
**Status:** BLOCKING all other topics
|
||
|
||
Until ICP is validated (selected + customer interviews complete), most other strategic discussions are premature. Focus on:
|
||
1. Complete ICP self-assessment
|
||
2. Conduct 10-15 interviews
|
||
3. Make go/pivot/stop decision
|
||
|
||
**All topics below are AFTER this milestone.**
|
||
|
||
---
|
||
|
||
## Urgent Topics (Schedule Within 1 Week)
|
||
|
||
### None at present
|
||
(ICP validation is the only urgent item - see separate doc `03_icp_research_questions.md`)
|
||
|
||
---
|
||
|
||
## Soon Topics (Schedule Within 1 Month)
|
||
|
||
### 1. MVP Scope Definition
|
||
**Context:** After ICP validated, need to strip product to ultra-minimal feature set
|
||
**Why urgent:** Cannot launch without clear scope
|
||
**Questions to address:**
|
||
- What's the ONE killer feature for validated ICP?
|
||
- Which planned features can we cut completely?
|
||
- What's the 80/20 - minimum to prove value?
|
||
|
||
**Inputs needed:**
|
||
- Customer interview insights (what do they actually need?)
|
||
- Current feature set inventory
|
||
- Development time estimates for each feature
|
||
|
||
**Desired outcome:**
|
||
- Single-page doc: "MVP v1 Scope"
|
||
- Clear go/no-go list of features
|
||
- 4-6 week timeline to shippable product
|
||
|
||
**Owner:** @men (recommendations) + Oleg (feasibility assessment)
|
||
**Urgency:** Soon (after ICP validation)
|
||
|
||
---
|
||
|
||
### 2. Pricing Strategy Finalization
|
||
**Context:** Rough pricing discussed ($49/$149), need to validate and finalize
|
||
**Why important:** Pricing is positioning - affects who signs up
|
||
**Questions to address:**
|
||
- Free tier: Yes/No? If yes, how limited?
|
||
- Trial length: 7 days? 14 days? 30 days?
|
||
- Tier structure: How many tiers? What limits per tier?
|
||
- Annual discount: 2 months free (standard)? More aggressive?
|
||
- What's our cost structure per customer? (COGS analysis)
|
||
|
||
**Inputs needed:**
|
||
- Validated ICP budget data (from interviews)
|
||
- Competitor pricing benchmarks (update with latest)
|
||
- Our cost structure (Gemini + CDN + infra per 100/500/1000 images)
|
||
|
||
**Desired outcome:**
|
||
- Pricing page copy ready
|
||
- Calculator: Image volume → recommended tier
|
||
- Value proposition per tier clearly articulated
|
||
|
||
**Owner:** @men (strategy) + Oleg (cost calculation)
|
||
**Urgency:** Soon (before MVP launch)
|
||
|
||
---
|
||
|
||
### 3. Pre-Launch Strategy
|
||
**Context:** Oleg asked: "нужно ли прÑмо ÑÐµÐ¹Ñ‡Ð°Ñ Ñоздать лÑндинг, где-то зарегеÑтрироватьÑÑ"
|
||
**Why important:** Early buzz vs. premature exposure trade-off
|
||
**Questions to address:**
|
||
- Landing page: Now or at launch? (Lean toward NOW)
|
||
- Product Hunt: Register product early for followers?
|
||
- Beta access: Waitlist or invite-only?
|
||
- Launch sequence: Soft launch → community → PH → press?
|
||
|
||
**Considerations:**
|
||
- Employer discovery risk (see Topic #7)
|
||
- Building in public benefits (social proof, feedback)
|
||
- Too early = vaporware stigma
|
||
- Too late = missed early adopter energy
|
||
|
||
**Desired outcome:**
|
||
- Pre-launch checklist
|
||
- Landing page V1 content
|
||
- Launch timeline (soft → full)
|
||
|
||
**Owner:** @men (strategy) + Oleg (execution)
|
||
**Urgency:** Soon (1-2 weeks after ICP validation)
|
||
|
||
---
|
||
|
||
## Eventually Topics (3+ Months Out)
|
||
|
||
### 4. Social Media & Content Strategy
|
||
**Context:** Oleg's accounts: Twitter, LinkedIn, dev.to, daily.dev
|
||
**Why important:** Developer marketing = content marketing + community
|
||
**Questions to address:**
|
||
- Which platforms to prioritize? (Can't do all equally)
|
||
- Content calendar: How often? What topics?
|
||
- Build in public: How transparent? What to share?
|
||
- Personal brand vs. product brand?
|
||
- LinkedIn: When to post? (employer risk)
|
||
|
||
**Framework to develop:**
|
||
- Platform-by-platform strategy
|
||
- Content pillars (3-5 themes)
|
||
- Distribution schedule (realistic for 15-20 hrs/week)
|
||
- Metrics to track (not vanity - real engagement)
|
||
|
||
**Research needed:**
|
||
- Analyze successful indie hackers on each platform
|
||
- Benchmark posting frequency
|
||
- Study what content gets traction in developer communities
|
||
|
||
**Desired outcome:**
|
||
- 90-day content plan
|
||
- Templates for recurring post types
|
||
- Clear dos/don'ts for each platform
|
||
|
||
**Owner:** @men (strategy) + Oleg (execution + authenticity)
|
||
**Urgency:** Eventually (after MVP has first users)
|
||
|
||
---
|
||
|
||
### 5. Plan B Strategy
|
||
**Context:** Oleg asked: "еÑли Ñам banatie не выÑтрелит"
|
||
**Why important:** Mental preparation reduces panic, enables faster pivot
|
||
**Questions to address:**
|
||
- At what point do we call it? (time? money? metrics?)
|
||
- What would Plan B look like?
|
||
- Different ICP for same product?
|
||
- Different product for same ICP?
|
||
- Completely different direction?
|
||
- How to preserve learnings/relationships if we shut down?
|
||
- What's the psychological/emotional process of letting go?
|
||
|
||
**Scenarios to explore:**
|
||
1. Pivot to different ICP (e.g., agencies → e-commerce)
|
||
2. Pivot to different product (use image gen expertise differently)
|
||
3. Acqui-hire / sell (if there's traction but not enough for solo)
|
||
4. Shut down gracefully, return to job search with upgraded skills
|
||
|
||
**Desired outcome:**
|
||
- Clear abort criteria (documented)
|
||
- Pivot playbook (if X, try Y)
|
||
- Emotional preparedness (this is OK, not failure)
|
||
|
||
**Owner:** @men (scenarios) + Oleg (personal constraints)
|
||
**Urgency:** Eventually (revisit if red flags appear)
|
||
|
||
---
|
||
|
||
### 6. Google Ads & Paid Marketing
|
||
**Context:** Oleg asked about Google Ads viability
|
||
**Why not urgent:** Paid marketing is for AFTER PMF, not before
|
||
**Questions to address:**
|
||
- Is Google Ads right channel for developer tools?
|
||
- What keywords would we target?
|
||
- What's realistic CPC and conversion rate?
|
||
- Budget needed for meaningful test?
|
||
- SEO vs. Ads priority?
|
||
|
||
**Current stance:**
|
||
- **Don't run ads before PMF** (waste of money)
|
||
- Focus on organic: content, community, word-of-mouth
|
||
- Consider ads only after:
|
||
- $5K+ MRR
|
||
- <3% churn (proven product)
|
||
- Clear ROI on customer acquisition
|
||
|
||
**Revisit when:**
|
||
- We have 20+ customers organically
|
||
- We know our LTV (lifetime value)
|
||
- We've maxed out organic channels
|
||
|
||
**Desired outcome:**
|
||
- Paid marketing readiness checklist
|
||
- When to start ads (specific triggers)
|
||
- Channel-by-channel assessment (Google vs. Twitter vs. LinkedIn)
|
||
|
||
**Owner:** @men (when ready)
|
||
**Urgency:** Eventually (6-12 months out)
|
||
|
||
---
|
||
|
||
### 7. "Свечение ФейÑа" (Employer Discovery Risk Management)
|
||
**Context:** Oleg's concern: "как Ñделать так чтобы работодатель не узнал о моем проекте раньше времени"
|
||
**Why sensitive:** Side project could jeopardize current income
|
||
**Questions to address:**
|
||
- Legal: What does employment contract say? (IP clauses? Non-compete?)
|
||
- Ethical: Is there conflict of interest? (Same industry?)
|
||
- Practical: How to market without LinkedIn exposure early on?
|
||
- Timeline: When is it safe to go public?
|
||
|
||
**Risk assessment:**
|
||
- **High risk channels:** LinkedIn (colleagues watch), company Slack
|
||
- **Medium risk:** Twitter (if colleagues follow), local meetups
|
||
- **Low risk:** Reddit (pseudonymous), Indie Hackers, dev.to (niche)
|
||
|
||
**Mitigation strategies:**
|
||
1. **Separate brand identity**
|
||
- Banatie brand (not "Oleg's project")
|
||
- Separate social accounts (not personal)
|
||
- Generic bio (don't mention current employer)
|
||
|
||
2. **Delayed LinkedIn presence**
|
||
- Don't post on LinkedIn until 3-6 months in
|
||
- OR: Negotiate with employer first (transparency)
|
||
- Post only after you have customers (serious project)
|
||
|
||
3. **Check employment contract**
|
||
- Review IP assignment clauses (does employer own side projects?)
|
||
- Check non-compete (can you work in same space?)
|
||
- Consult lawyer if unclear (worth $200-500 for peace of mind)
|
||
|
||
4. **Gradual public presence**
|
||
- Month 1-3: Stealth, private beta
|
||
- Month 3-6: Soft public launch (dev.to, Indie Hackers, Reddit)
|
||
- Month 6+: Full public (LinkedIn, Twitter, local meetups)
|
||
|
||
5. **Employer conversation options:**
|
||
- **Option A (Risky):** Ask permission explicitly (could trigger concern)
|
||
- **Option B (Safe):** Wait until you have traction, then inform
|
||
- **Option C (Safest):** Keep stealth until you're ready to quit
|
||
|
||
**Desired outcome:**
|
||
- Clear timeline: When to go public on each platform
|
||
- Legal clarity: Contract reviewed, no surprises
|
||
- Backup plan: If employer finds out early, how to respond?
|
||
|
||
**Owner:** Oleg (contract review) + @men (strategy)
|
||
**Urgency:** Eventually (but address BEFORE pre-launch marketing)
|
||
|
||
---
|
||
|
||
## Parked Topics (Low Priority)
|
||
|
||
### 8. Partnership & Integration Strategy
|
||
**Context:** Which tools to integrate with? (Webflow, Framer, Shopify, etc.)
|
||
**Why low priority:** Need PMF first, then expand distribution
|
||
**Park until:** $5K+ MRR
|
||
|
||
### 9. Hiring & Delegation
|
||
**Context:** When to bring on help? What roles first?
|
||
**Why low priority:** Solo is viable until $10K+ MRR
|
||
**Park until:** Oleg is bottleneck (too much support, too many leads)
|
||
|
||
### 10. Fundraising Consideration
|
||
**Context:** Stay bootstrapped or seek funding?
|
||
**Why low priority:** Prove PMF first, then decide
|
||
**Park until:** $10K+ MRR or clear acceleration opportunity
|
||
|
||
### 11. International Expansion
|
||
**Context:** Which markets to target first? Localization needs?
|
||
**Why low priority:** Start global, but don't overthink geography
|
||
**Park until:** Clear geographic demand signals emerge
|
||
|
||
### 12. Exit Strategy / Long-term Vision
|
||
**Context:** Build to sell? Build lifestyle business? Build empire?
|
||
**Why low priority:** Too early to know
|
||
**Park until:** Post-PMF, $20K+ MRR
|
||
|
||
---
|
||
|
||
## Topics Completed ✅
|
||
|
||
### ✅ Market Positioning & Segments
|
||
**Completed:** Oct 19, 2025
|
||
**Output:** `01_market_positioning_and_segments.md`
|
||
**Key decisions:** Converging AI gen + CDN, targeting developers, not enterprises initially
|
||
|
||
### ✅ Reality Check & Timeline
|
||
**Completed:** Oct 19, 2025
|
||
**Output:** `02_reality_check.md`
|
||
**Key decisions:** 3-phase approach, keep job until $6K MRR, hybrid at 6 months
|
||
|
||
### ✅ Business Terminology & Concepts
|
||
**Completed:** Oct 19, 2025
|
||
**Output:** Inline clarifications in discussion
|
||
**Key terms:** ARR, MRR, churn, ICP, PMF, pivot, bandwidth
|
||
|
||
---
|
||
|
||
## Topic Request Process
|
||
|
||
**For Oleg:**
|
||
When you want to discuss something new:
|
||
1. Add it to appropriate section above
|
||
2. Include context (why this matters now)
|
||
3. Note urgency level
|
||
4. Flag in weekly check-in if it's time-sensitive
|
||
|
||
**For @men:**
|
||
- Review backlog weekly
|
||
- Reprioritize based on Oleg's progress
|
||
- Proactively surface topics as they become relevant
|
||
- Prune topics that are no longer applicable
|
||
|
||
---
|
||
|
||
## Quarterly Review Prompts
|
||
|
||
**Every 3 months, ask:**
|
||
1. Which topics can be removed? (no longer relevant)
|
||
2. Which topics should be elevated? (more urgent than before)
|
||
3. What new topics should be added? (based on progress)
|
||
4. Are we focusing on the right things? (strategy check)
|
||
|
||
---
|
||
|
||
**Document owner:** @men + Oleg (joint)
|
||
**Next review:** After ICP validation complete
|
||
**Last updated:** October 19, 2025
|
||
**Related docs:** All strategic documents reference this backlog
|